Zubair Oil Field Development Project – Degassing Station
Country: Iraq
Client: ENI E&P
Activity: Plant – Oil & Gas
The project consisted of all detailed design for the revamp of the degassing station to increase production to 700 kBOPB.
The project was carried out in three phases:
- conversion of existing trains from dry to wet;
- renewal of water injection system;
- installation of fiscal metering station.
Enereco carried out the review of FEED design and carried out the detailed design as well as activities in support of procurement.