Cervignano-Mortara Natural Gas Pipeline ND 56”, DP 75 bar, 61 km

Country: Italy
Client: Snam Rete Gas
Activity: Pipeline – Oil & Gas

The project consists of the basic and detailed design to replace an existing natural gas pipeline as well as the replacement and of a series of branch points.

Enereco’s activities include the feasibility study, basic and detailed design and work supervision with a multidisciplinary team of more than 20 person.

E

ENGINEERING

we provide multidisciplinary engineering services based on a substantial experience in major capital projects as well as in the use of industry’s leading types of software, codes and practices.

B

Buildability